After-sales Service: | Technical Support Available |
---|---|
Open Style: | Side Hung Door |
Shower Mode: | Forced Shower |
Frame Material: | SUS304 |
Panel Material: | SUS304 |
Tray Material: | SUS304 |
Customization: |
---|
Suppliers with verified business licenses
A forced shower system is a device that is used in special environments, such as bio-safety laboratories or workshops, to ensure the physical adaptability and bio-safety of the personnel when they leave the bio-hazard area. Its main function is to wash and disinfect the whole body of the personnel by spraying water, to prevent the spread of bio-contamination.
Model |
BS-03-FS-1 |
Installtion method |
Flush with the wall panel |
Airtight method |
Sealing ring inflation barrier |
Control mode |
Siemens PLC |
Communication mode |
RS232 RS485 TCP/IP |
Compressive strength |
≥2500Pa |
Corrosion resistance |
H2O2 sterilization, formaldehyde sterilization, disinfectant |
Internal environment |
Negative pressure |
Work environment |
-30ºC+50ºC |
shower method |
Automatic Sprinkler, forced water supply |
Switching time |
Inflatable≤5s Deflation≤5s |
Open mode |
HMI Human Machone Interface /Physical Byttons |
Locking method |
Electromagnetic lock interlock |
Doorframe material |
304/316 |
Door leaf material |
304/316 |
Sealing strip material |
Silicon rubber |
Inlet medium |
Compresssed air |
Inflation pressure |
≥0.25Mpa |
Action mode |
The electromagnetic valve |
Pressure interface gauge |
RC1/8 |
Temperature and humidity detection |
0-80ºC,0-100%RH |
Power Supply |
220V 50Hz |
Net weight |
200KG |
Door closer |
DORMA |
Window |
Round tempered glass |
Door handle |
¢25mm U-shaped |
Shower |
Atomizing nozzle+Shower head |
Water supply device |
Boost cycle |
Poit lamp |
Red closed state,green passage |
Escape device |
Yes |
Pressure monitoring |
Yes |
Purification function |
Yes |
Drainage device |
Anti-backflow floor drain |
Purification filter |
HEPA H14 |
Error alarm |
Low pressure<0.15Mpa |
BMS system |
Accessible |
Authority management |
Level 3 permissions |
Inspection report |
Verifiction Report of the Third Party (National Inspection Center) |
Validation Documentation |
3Q documents |
Customized services |
Yes |
After-sales service |
Yes |
Installation Services |
Additional quotations are required for different regions and countries |
Suppliers with verified business licenses